Ask us about our Pickleball Packages!

0

Your Cart is Empty

Installation - Basketball System (TORONTO Area) Minimum 2-Separate Day Process

Installed by the professionals.

Service includes:

  1. Excavation of existing substrate (grass, soil, concrete & asphalt) included.*
  2. Removal & disposal of existing substrate off-site.
  3. Sonotube suitable for concrete footing.
  4. Concrete supply.
  5. Installation of anchor base for basketball system.
  6. Erection of basketball system 24-72 hours following. 

Additional Notes:
*Additional charge applies for all installations outside of TORONTO.

**Public locates must be completed by homeowner prior to installation arrival.

Installed by the professionals.

Service includes:

  1. Excavation of existing substrate (grass, soil, concrete & asphalt) included.*
  2. Removal & disposal of existing substrate off-site.
  3. Sonotube suitable for concrete footing.
  4. Concrete supply.
  5. Installation of anchor base for basketball system.
  6. Erection of basketball system 24-72 hours following. 

Additional Notes:
*Additional charge applies for all installations outside of TORONTO.

**Public locates must be completed by homeowner prior to installation arrival.


Colour Chart